top of page
City Center Plaza
Built: Unbuilt pending funding
Budget: $2 million
Location: Undisclosed
KDC Associates was retained to design a small outdoor plaza to serve as a focal element in the renovation of a declining downtown area. The plaza reflects the industrial nature of the community with corten steel columns and heavy limestone base material. An dynamically illuminated water feature serves as both a sculptural element as well as interactive play for children visiting the plaza. Adjacent to a popular restaurant, the plaza would include limited outdoor seating as well as a small stage for area performers.
bottom of page